No Comments Appendix 6

Appendix 6

A copy of the SMP 2, which includes maps setting out the affected coastal areas, can be viewed at

(http://www.westofwalessmp.org/content.asp?nav=23&parent_directory_id=10).

SMP2 Policy Boundaries

Preferred Policies

PDZ

MAN

PU

Policy Name

Policy Comments

2025

2055

11

22

PU11.14

Ro Wen coast

This would involve relocation of property owners and businesses from Fairbourne

HTL

MR

PU11.15

Ro Wen spit

MR

MR

PU11.16

Fairbourne Embankment

HTL

MR

24

PU11.15

Barmouth North

This may include the relocation of properties

HTL

MR

12

27

PU12.10

Briwet & Dwyryd Gorge

Maintain toll road and railway line

NAI

NAI

PU12.11

Upper Dwyryd Estuary

Local Management of defences to maintain main roads

MR

NAI

PU12.12

Penrhyndeudraeth Headland

This might not preclude local private management of defences subject to normal approvals

NAI

NAI

28

PU12.15

Samson Bay

NAI

NAI

PU12.16

Morfa Bychan

Sustain natural dune defence with management of access. Develop a long term management plan for adaptation within Holiday Park area and potential future flood risk to village.

MR

MR

29

PU12.17

Criccieth Shingle Banks

Consideration of potential to realign the railway

HTL

MR

PU12.19

Castle Headland

NAI

NAI

PU12.21

Y Dryll

NAI

NAI

PU12.22

Dwyfor

Consider impact on railway

MR

NAI

PU12.23

Glanllynnau Cliffs

Maintain geological exposure

NAI

NAI

PU12.24

Afon Wen

Concerns over long term sustainability.
Consider possible realignment in land of
the railway.

HTL

MR

PU12.25

Penychain east

This might not preclude local private
management of defences subject to
normal approvals.

NAI

NAI

13

31

PU13.1

Penychain and
western section of the
bay

NAI

NAI

PU13.2

Abererch

Subject to national consideration of
railway

HTL

MR

PU13.7

Golf Course

Detailed study to allow transition between
Traeth Crugan and South Beach

HTL

MR

PU13.8

Traeth Crugan

Intent to create new entrance estuary to
the Afon Penrhos and to manage new
defence to the core of Pwllheli

HTL

MR

PU13.9

Llanbedrog

This would not preclude local
management of the slipway area.

NAI

NAI

32

PU13.10

Mynydd Tir Cwmwd

NAI

NAI

PU13.11

The Warren

Progressive management of the retreating
shoreline to maintain the beach

HTL

MR

PU13.12

Abersoch

Consider opening up tidal flooding of the
Afon Soch and planning of future use of
the entrance

HTL

MR

PU13.14

Borth Fawr Central

Opportunity for adaptation

HTL

MR

PU13.15

Machroes

This would not preclude local
management of the road.

HTL

MR

33

PU13.16

Machroes headland

NAI

NAI

PU13.17

St Tudwal's islands

NAI

NAI

PU13.18

Porth Ceiriad

NAI

NAI

PU13.19

Cilan Headland

NAI

NAI

14

34

PU14.1

Mynydd Cilan West

NAI

NAI

PU14.2

Hells Mouith South

Local readjustment and dune management

NAI

NAI

PU14.3

Hells Mouth Centre

NAI

NAI

PU14.4

Hells Mouth North

Future realignment or loss of road

NAI

NAI

PU14.5

Rhiw

NAI

NAI

35

PU14.6

Ysgo

NAI

NAI

36

PU14.7

Aberdaron East

Consider how the transition between
Aberdaron Village frontage and this unit is
managed to allow adaptation.

NAI

NAI

PU14.8

Aberdaron Village and coastal slope

Develop Managed Realignment within a
framework for sustainable development of
the village. Address transport issues.

HTL

MR

PU14.9

Uwchmynydd

NAI

NAI

37

PU14.10

Ynys Enlli

Consider adaptation to landing stage

NAI

NAI

38

PU14.11

South West Llyn

Local management would not be
precluded to allow adaptation of use within
a principle of allowing natural evolution of
the coast.

NAI

NAI

15

39

PU15.1

Carreg Ddu to
Trwyn y Tal

Overarching policy setting the base
intent for the zone.

NAI

NAI

PU15.2

Porth Dinllaen,
including Morfa
Nefyn

This would require detailed planning
for adaptation at Porth Dinllaen and
managed retreat at the access at
Morfa Nefyn

HTL

MR

40

PU15.4

Trwyn y Tal to
Trwyn Maen
Dylan

Overarching policy setting the base
intent for the zone.

NAI

NAI

PU15.5

Trefor

A detailed local plan would be needed
to sustain amenity value of the area.

MR

MR

PU15.6

Aberdesach

Local management of the shingle
bank and river discharge to sustain
natural defence of the area.

MR

MR

16

41

PU16.1

Pontllyfni

This would not preclude maintenance
of private defence during the first
epoch. Review flood risk to main road
and sewage works

NAI

NAI

PU16.2

Pontllyfni to Dinas Dinlle

Maintain sediment supply to the north

NAI

NAI

PU16.3

Dinas Dinlle

Manage transition between Dinas
Dinlle Head and open coast with the
intent to manage flood risk to village
on higher ground.

HTL

MR

PU16.4

Morfa Dinlle

Develop management to self
sustaining dune frontage. This would
not specifically preclude management
of the local area at Fort Belan subject
to normal approvals.

MR

MR

PU16.5

Foryd bay

Manage flood defence initially with the
intention of returning the bay to a
naturally functioning system.

HTL

MR

PU16.6

Traeth Abermenai

This would include further
examination of potential flood risk to
Dwyran, with the intent to provide
defence.

NAI

NAI

PU16.7

Abermenai Spit
and Traeth
Llanddwyn

Removal of forestry to allow width for
coastal adjustment

NAI

NAI

42

PU16.8

Newborough
Forest

Removal of forestry to allow width for
coastal adjustment

NAI

NAI

PU16.10

Bodowen Cliffs

NAI

NAI

43

PU16.13

Waterloo Port to
Glan y Mor -Y
Felinheli

This would not preclude local
management through private funding
subject to normal approvals.

NAI

NAI

PU16.15

Glan-y-mor
Lodge to Bridge

NAI

NAI

PU16.16

Bridge to Barras

NAI

NAI

PU16.17

Barras to
Mermaid Inn

Intent to maintain access but with
future need for adaptation to
increased flood risk.

HTL

MR

44

PU16.18

Llanfair Bay

NAI

NAI

PU16.20

Pont Cadnant to
Gallows point

This would not preclude private works
subject to normal approvals.

NAI

NAI

PU16.23

Drumlin

NAI

NAI

PU16.25

Llanfaes to
Penmon

Potential need to realign road

NAI

NAI

45

PU16.26

Bridge to Garth

NAI

NAI

PU16.30

Penrhyn
Headland

NAI

NAI

46

PU16.31

Afon Ogwen to
Madryn

NAI

NAI

PU16.32

Afon Aber

Adapt defences to maintain natural
sediment drift with long term intent to
protect transport route from potential
flooding.

MR

MR

17

47

PU17.1

Trwyn y Parc Headland

NAI

NAI

PU17.2

Traeth mawr

Maintain natural function of dune
system and estuary

NAI

NAI

PU17.3

Aberffraw

Adapt road and quay to support
natural function of the estuary

HTL

MR

PU17.4

Aberffraw cliffs

This might not preclude appropriate
management of the road at Porth
Trecastell

NAI

NAI

48

PU17.5

Porth Trecastell to Rhosneigr

This would not preclude management
of defences at Cerrig Defaid in the
first two epochs.

MR

MR

PU17.8

Traeth Crigyll
and Traeth
Cymyran

Relocation of facilities to RAF Valley

NAI

NAI

49

PU17.9

General policy
for Southwest

Management to local bays is defined
below.

MR

MR

PU17.10

Borthwen

This would not preclude local private
defence subject to normal approvals

MR

MR

PU17.14

Northwest coast

NAI

NAI

50

PU17.16

Penrhos Bay

Examination of potential flood risk

MR

MR

PU17.17

Penrhos Headland

This would not preclude local private
defence subject to normal approvals

NAI

NAI

51

PU17.19

General policy
for Inland Sea

Local defence to sustain Four Mile
Bridge and local defence against
flood within hinterland

MR

MR

52

PU17.21

Newlands

Co-ordinated approach to slowing
erosion

MR

MR

PU17.22

Afon Alaw

Long term planning to reduce residual
flood risk

MR

MR

PU17.23

Traeth Gribin to Trwyn Cliperau

This would not preclude local private
defence subject to normal approvals

MR

MR

18

53

PU18.1

Twyn Cliperau
to Wylfa Head

Overarching policy for whole area,
with local policy as set out below

NAI

NAI

PU18.2

Porth Tywynmawr

MR

NAI

PU18.3

Porth Trefadog

MR

NAI

PU18.4

Porth Trwyn

NAI

NAI

PU18.5

Porth Swtan

NAI

NAI

PU18.6

Cemlyn Bay and Headland

MR

NAI

54

PU18.18

Cemaes Bay
west

NAI

NAI

PU18.12

Pig y Barcud
Cliffs

NAI

NAI

55

PU18.13

Trwyn y Parc to
Trwyn Cwmryd

Overarching policy for whole area,
with local policy as set out below

NAI

NAI

PU18.14

Porth Wen
Brickworks

MR

MR

PU18.16

Trwyn Costog

MR

MR

PU18.18

Porth Elian

HTL

MR

56

PU19.1

General

NAI

NAI

PU19.2

Portobello

MR

MR

PU19.3

Traeth Dulas

NAI

NAI

57

PU19.4

Porth Lydan

MR

MR

PU19.6

Moelfre to Traeth Bychan

NAI

NAI

PU19.7

Traeth Bychan Centre

MR

NAI

PU19.8

Traeth Bychan South

NAI

NAI

58

PU19.9

Borth Wen Cliffs

NAI

NAI

PU19.11

Trwyn Dwlban

NAI

NAI

PU19.13

Croesfryn

NAI

NAI

PU19.14

Afon Nodwydd

MR

MR

PU19.15

Llanddona Beach

NAI

NAI

PU19.16

Trwyn Penmon Cliffs

NAI

NAI

PU19.17

Puffin Island

NAI

NAI

Key:

PDZ = Policy Development Zones
MAN = Management Area
PU = Policy Unit
HTL = Hold the Line
NAI = No Active Intervention
MR = Managed Realignment