Joint Local Development Plan Consultation Portal

Niobe

Please note: You only need to register / login if you wish to make representations.

Representations on Deposit Joint Local Development Plan - 7.4.99

Representation ID: 1075

OBJECT Llywodraeth Cymru (Mr Mark Newey)

Summary:

By including 'up to 5 days at a time' restricts the Local Authorities in future if they found this time limit was counter-productive. It also states that a transit site of 15 pitches could be required to accommodate 15 caravans. ). However, the Welsh Government's Designing Gypsy and Traveller Sites guidance states each transit pitch should be capable of accommodating two tourer caravans. Therefore, a site of 8 pitches should suffice.

Having trouble using the system? Visit our help page or contact us directly.

Powered by OpusConsult