Joint Local Development Plan Consultation Portal

Please note: You only need to register / login if you wish to make representations.

Representations on Deposit Joint Local Development Plan - POLICY TAI14, T12 - Land near Cae Rhos, Holyhead

Representation ID: 1566

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* Holyhead Wastewater Treatment Works (WwTW) can accommodate the foul flows from these proposed development sites/growth figure.

Representation ID: 1565

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* There are isolated incidents of flooding in the public sewerage system that may need to be resolved to allow development to proceed. Potential developers can either wait for DCWW to resolve the flooding, subject to funding being approved by our regulator Ofwat, or progress the improvements through the sewerage requisition provisions of the Water Industry Act 1991 or S106 of the Town & Country Planning Act 1990. A hydraulic modelling assessment (HMA) may be required to determine the point of connection to the public sewerage system and potential developers would be expected to fund investigations during pre-planning stages.

Representation ID: 1564

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* A water supply can be provided to serve this site.
* Potential developers need to be aware that the site is crossed by a sewer and protection measures in the form of easement widths or a diversion of the pipe would be required, which may impact upon the housing density achievable on site.

Representation ID: 660

SUPPORT Mr TA Nevin

Summary:

The site T12 will meet with all the relevant issues raised by any / all council. Departments to support a housing development.

Representation ID: 402

OBJECT Mr Dave Eccles

Summary:

Note: Previous Representation No. 387 for Land near Cae Rhos referred to Grid References :
GR 242 811
GR 246 813
GR 243 810
GR 244 810

Representation ID: 387

OBJECT Mr Dave Eccles

Summary:

The AONB, SAC and SPA will all be adversely affected by the proximity and the amount of additional proposed housing developments.
Pluvial flooding associated with standing water. Poorly drained land will place significant constraints on development.
Bedrock at shallow depth will present constraints on the construction and design of the sites drainage. Bedrock near the surface limits the fall on drainage runs and the options for surface water management and disposal. Alternative brownfield sites with the advantages of services access, no flooding, and green space for amenities are in close proximity. Two large windfall sites resulting from 2 agreed, school closures. That the land at Cae Rhos not be considered as a site designated for housing or other development.

Having trouble using the system? Visit our help page or contact us directly.

Powered by OpusConsult