Joint Local Development Plan Consultation Portal

PLEASE NOTE: You only need to register / login if you wish to make representations.

Representations on Deposit Joint Local Development Plan - POLICY CYF1, C1 - Parc Bryn Cegin, Bangor

Representation ID: 1613

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* The site would eventually drain to the Bangor Beach Road SPS and an assessment of this SPS may be required to establish whether flows from this site can be accommodated or whether future improvements would be required to the SPS to allow development to proceed.
* The proposed growth being promoted for this settlement would require improvements at Treborth Wastewater Treatment Works (WwTW) which would need to be funded through our Asset Management Plan or potentially earlier through developer contributions.

Representation ID: 1612

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* A sewage pumping station (SPS) is located within the site and an assessment may be required to establish whether the flows from this site can be accommodated or whether future improvements to the SPS will be required to allow development to proceed. Should the existing sewerage infrastructure not be sufficient to accommodate the proposed level of growth the provision of sewerage infrastructure can be acquired through the sewer requisition provisions of the Water Industry Act 1991 (as amended).

Representation ID: 1611

OBJECT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* The employment area represents a substantial area of land for development for which the potential demands are unknown at present. Once demands are known an assessment can be made of the extent of any off-site water mains that may be required. This site is crossed by a 250mm water main along its northern boundary which will restrict development density for the site. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times.

Representation ID: 786

OBJECT Parc Bryn Cegin Cinema campaign (mrs Tammy Hales)

Summary:

We request the planning status of Parc Bryn Cegin, is changed from business planning employment, to include
leisure planning permission status A1, A3, C1, D2 & D8. Thus creating;
1) Local employment,
2) Much needed leisure facilities,
3) Creating a tourist attraction and
4) Boosting the local economy.
If the planning status of Parc Bryn Cegin remain unchanged, it is likely the site will remain dormant.

To change the planning status of Parc Bryn Cegin from business planning employment, to include or ideally change to leisure planning permission status A1, A3, C1, D2 & D8.

Having trouble using the system? Visit our help page or contact us directly.

Powered by OpusConsult