Joint Local Development Plan Consultation Portal

Niobe

Please note: You only need to register / login if you wish to make representations.

Representations on Deposit Joint Local Development Plan - POLICY CYF1, C13 - Bryn Cefni Industrial Estate, Llangefni

Representation ID: 1629

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

Our local water network should be sufficient to provide the domestic water demands required to serve this development area.
The sewerage network in the area is extensive and where sewers cross potential development sites this will restrict development density for the site, and protection measures in respect of these assets will be required. Llangefni Main Sewage Pumping Station is located in the area and may need assessment to ascertain its capacity dependant on the location and type of development proposed.
Llangefni Wastewater Treatment Works (WwTW) can accommodate the foul flows from the domestic demands arising from this development area.

Having trouble using the system? Visit our help page or contact us directly.

Powered by OpusConsult