Joint Local Development Plan Consultation Portal

Niobe

Please note: You only need to register / login if you wish to make representations.

Representations on Deposit Joint Local Development Plan - POLICY CYF1, C14 - Land to the north of Lledwigan Farm, Llangefni

Representation ID: 1687

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* The site is crossed by a pumped rising foul main which may restrict development density for the site. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. Protection measures in respect of these assets will be required either in the form of an easement width or a possible diversion of the asset. The site is adjacent to a pumped rising main and Llangefni Main SPS. An assessment of the SPS may be required to establish whether the flows can be accommodated or whether improvements to the SPS' will be required to allow development to proceed. Off-site sewers would be required to connect to the nearest point of adequacy on the sewerage network.

Representation ID: 1631

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* Llangefni Wastewater Treatment Works (WwTW) can accommodate the foul flows from the domestic demands arising from this development area.

Representation ID: 1630

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* Our local water network should be sufficient to provide the domestic water demands required to serve this development area

Representation ID: 1402

OBJECT Bob Parry & Co Ltd represented by Owen Devenport Ltd (Mr Berwyn Owen)

Summary:

Include the Dafarn Newydd site as an alternative to the Lledwigan Farm site. The proposed alternative site for employment in Llangefni is a sustainable development proposal. The suggested site at Dafarn Newydd is an appropriate addition to the settlement, and would perform better against the LDP's criteria than site C14 at Lledwigan Farm.

Representation ID: 1053

OBJECT Llywodraeth Cymru (Mr Mark Newey)

Summary:

The potential loss of BMV land could result in the permanent loss of approximately 40 hectares. The majority of the land is included in allocations TRA1, C14 and C15 and the plan has limited evidence to demonstrate that paragraph 4.10 has been considered at all in allocating these sites for development.

Having trouble using the system? Visit our help page or contact us directly.

Powered by OpusConsult