Representations on Deposit Joint Local Development Plan - POLICY CYF1, C30 - Anglesey Aluminium land, Holyhead

Representation ID: 1653

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* The site is located adjacent to Holyhead WwTW which may give rise to odour, fly and noise nuisance for any development in close proximity to the works. As such your authority may wish to consider providing a buffer zone between the works and any proposed development site.
* Holyhead Wastewater Treatment Works (WwTW) can accommodate the foul flows from the domestic demands arising from this development area.

Representation ID: 1652

SUPPORT Dwr Cymru Welsh Water (Mr Dewi Griffiths )

Summary:

* Our local water network is sufficient to provide the domestic water demands required to serve this development area.
* The public sewerage network can accept the domestic foul flows arising from this development area. Potential developers need to be aware that the site is crossed by a sewer. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights to access its apparatus at all times. Protection measures in respect of these assets will be required either in the form of an easement width or a possible diversion of the asset.